Lots of progress has been made this week on prepping for foundations to go in for both the new entry and the connector. Under all the snow, you can see the framework of the new entry, and the floor of the connector is taking shape as well.
Two of the three doors that used to lead to the chancel have been reframed to lead to the new level of the floor, and the future lobby space has been reinforced enough to no longer need a temporary wall holding it up.